Projects for the week include:
Long-term
- Advertisement -
Until further notice: Smoketown Road
at the Little Sacony Creek Bridge, Rockland Township, closed.
Through July 27, 2022: Route 222 westbound
in West Earl and Ephrata townships, Lancaster County, milling, paving, base repairs, concrete patching, guide rail upgrades, drainage, signs and pavement markings, 6 a.m. to 2 p.m.
Through Sept. 12: Pine Forge Road
closed between Manatawny Drive and Colebrookdale Road, Douglass Township, bridge repair.
Through 2021: River Road/West Spring Street
closed in Reading for first phase of construction for the Route 183/River Road Extension Project.
Through Sept. 2: 1100 block East Wyomissing Boulevard
, Reading, milling and paving, 7 a.m. to 5 p.m.
Daily
August 8-12: Interstate 78
between Exit 30 (Hamburg) and Exit 23 (Shartlesville), construction, 7 p.m. to 6 a.m.
August 9-14: Interstate 78
between Exit 30 (Hamburg) and Exit 35 (Route 143), construction, 7 p.m. to 6 a.m.
August 9-13: Route 863
between Kistler Valley Road and Route 143, Lehigh County, pothole patching, 8 a.m. to 2 p.m.
August 9-11: Route 183
between North Heidelberg and Shartlesville Roads, Bernville and Penn Township, crack sealing, 7 p.m. to 5 a.m.
August 9-11: Mount Laurel Road
between Hirsh and Frush Valley Roads, Muhlenberg Township, drainage, 7 a.m. to 3 p.m.
August 9-11: Route 222
between Lancaster County and the Gouglersville Exit, Spring and Brecknock townships, brush cutting, 7 a.m. to 3 p.m.
August 9-10: Interstate 78 east
between Exit 45 (Route 863) and Exit 40 (Route 737), one lane closed for construction between 7 p.m. Aug. 9 to 6 a.m. Aug. 10.
August 9: Route 422 westbound
between the Stowe interchange and River Bridge Road, Douglass Township, bridge repair, 7 a.m. to 3 p.m.
August 9: North Heidelberg Road
between Routes 183 and 422, Robesonia and Heidelberg and North Heidelberg townships, shoulder work-widening, 7 a.m. to 3 p.m.
August 10-11: Brownsville Road
between North Heidelberg Road and Upper Van Reed Road, North Heidelberg and Lower Heidelberg Townships, shoulder work-widening, 7 a.m. to 3 p.m.
August 10: Route 422
/West Shore Bypass between Penn Street/Penn Avenue exits in West Reading and Perkiomen Avenue in Exeter Township, unspecified work, 8:30 a.m. to 12:30 p.m.
August 10: Mount Laurel Road
between Kutztown and Pricetown Roads, Muhlenberg and Alsace townships, drainage, 7 a.m. to 3 p.m.
August 11-13: Route 183
between North Heidelberg and Plum Creek Roads, Penn Township, crack sealing, 7 p.m. to 5 a.m.
August 12-13: Route 422
between Interstate 176 and Mount Penn exit, Exeter Township, brush cutting, 7 a.m. to 3 p.m.
August 12: Heffner Road
between Brownsville Road and Church Street, Lower Heidelberg Township, shoulder work-widening, 7 a.m. to 3 p.m.
August 12: Prison Road
between Mull and Kercher Avenues, Bern Township, drainage, 7 a.m. to 3 p.m.
August 13-14: Philadelphia Avenue
at Route 100, Boyertown, gas line inspection, 9 a.m. to 4 p.m.
August 13: Route 422
between Gaul and Green Valley Roads, Lower Heidelberg Township, drainage, 7 a.m. to 3 p.m.
August 13: Route 422
between Lebanon County and North Heidelberg Road, Robesonia, shoulder work-widening, 7 a.m. to 3 p.m.
August 16-17: Fifth Street Highway
at Route 12, Muhlenberg Township, gas line inspection, 9 a.m. to 4 p.m.